Image Credits : Source: Sicim | Visual for illustration purpose
1 minute read

Sicim wins the third lot of the Sestino – Minerbio methane pipeline

Sicim was awarded the third lot by Snam for the construction of the Sestino – Minerbio methane pipeline which, with a total length of over 140 km and a diameter of 48″, aims to strengthen the Italian gas transport network.

The value of the order is over 100 million euros .

For this lot Sicim will be responsible for the construction of a 31 km line that will cross various locations in the Province of Forlì Cesena (FC), including Mercato Saraceno, Roncofreddo, Sogliano al Rubicone and Cesena.

Read also: For Sicim two million working hours without accidents in Saudi Arabia .

The works, which will involve around 300 people , involve the construction of: two line systems, 8 microtunnels (for a length of approximately 2,750 metres ), the excavation of a 128 meter tunnel and a tunnel with TBM ( Tunnel Boring) technology. Machine ) with a length of 2,180 meters .

Two Direct Pipes of 1,270 meters of development and controlled horizontal drilling (TOC) of the same length are also planned, to serve the laying of the optical fiber cable and the crossing of 11 open-air river courses .

The completion of the works is estimated for 2026 .

Legal Disclaimer:
Pipeline News
GLOBAL FLOW CONTROL provides the information “as is” without warranty of any kind. We do not accept any responsibility or liability for the accuracy, content, images, videos, licenses, completeness, legality, or reliability of the information contained in this article. If you have any complaints or copyright issues related to this article, kindly contact the provider above. "

Latest News

  • Oil and Gas
    1 minute read

    GAIL India lines up Rs 50,000-cr…

    22 May. 2024 | Global Flow Control
  • LNG and Industrial Gases
    3 minutes read

    Egyptian player rolls up its sleeves…

    22 May. 2024 | Global Flow Control
  • Hydrogen and Carbon Capture
    2 minutes read

    Battery storage plant at Teesworks as…

    22 May. 2024 | Global Flow Control
  • Hydrogen and Carbon Capture
    2 minutes read

    Amp Energy finalizes agreements for 10…

    22 May. 2024 | Global Flow Control