Image Credits by Markus Distelrath from Pixabay Visual for illustration purposes
1 minute read

Protocol Signed to Launch Construction of Low-Power Nuclear Power Plant in Uzbekistan

The State Enterprise “Directorate for Construction of a Nuclear Power Plant” under the Uzatom Agency and JSC Atomstroyexport, the engineering division of Rosatom State Corporation, have signed a protocol to commence work on the construction site of Uzbekistan’s future low-power nuclear power plant (LPNPP), according to UzA.

The protocol was signed in the presence of Nikolay Spassky, Deputy CEO for International Relations at Rosatom, and Azim Akhmedkhadjayev, Director of the Atomic Energy Agency under the Cabinet of Ministers of the Republic of Uzbekistan.

Otabek Amanov, Director of the Directorate for Construction of a Nuclear Power Plant under the Uzatom Agency, stated, “Today’s signing marks the transition to active work on the implementation of the first LPNPP in Uzbekistan and will soon allow us to begin direct activities at the construction site.”

Pavel Bezrukov, Director of NPP Construction Projects in Central Asia at JSC ASE, added, “The protocol confirms the fulfillment of the priority conditions concerning regulatory and financial obligations of the parties. Rosatom’s Engineering Division will now actively develop the documentation needed to obtain a license for the LPNPP and begin survey work at the construction site.”

Legal Disclaimer:
KazInform
GLOBAL FLOW CONTROL provides the information “as is” without warranty of any kind. We do not accept any responsibility or liability for the accuracy, content, images, videos, licenses, completeness, legality, or reliability of the information contained in this article. If you have any complaints or copyright issues related to this article, kindly contact the provider above. "

Latest News

  • Marine and Shipbuilding
    1 minute read

    ESL Shipping Orders Quartet of Methanol-Powered…

    09 Oct. 2024 | Global Flow Control
  • Hydrogen and Carbon Capture
    1 minute read

    Egypt and Norway’s Scatec to Strengthen…

    09 Oct. 2024 | Global Flow Control
  • Oil and Gas
    2 minutes read

    Major Contract Awarded for BP’s Kaskida…

    09 Oct. 2024 | Global Flow Control
  • Power Generation
    3 minutes read

    Chachimbiro Geothermal Project: Ecuador secures $43…

    09 Oct. 2024 | Global Flow Control