Image Credits : Photo: Avigator Fortuner / Shutterstock.com visual for illustration purpose
1 minute read

Oman signs agreement for construction of second phase of industrial waste treatment facility

Oman Environmental Services Holding Company “be’ah” has signed an agreement with Tialoc and Al Ramooz National to establish the second phase of the industrial waste treatment facility in Sohar Free Zone.

The agreement was signed by Eng. AbdulKareem Qasim Al Balushi, COO of Hazardous Waste Operations, and Christoph Engel, CEO of Tialoc Group, as part of “be’ah’s” ongoing efforts to improve the industrial waste management infrastructure in the Sultanate.

The second phase of the project includes the development of an integrated industrial waste treatment facility that will include hazardous waste treatment, physical and chemical processing, as well as waste oil and toxic waste treatment facilities. In addition, storage tanks and advanced infrastructure will be provided to support operations. This project is expected to contribute to national sustainability goals and strengthen the local economy by creating new employment opportunities.

It is worth noting that the first phase of the Sohar Industrial Waste Treatment Facility has been operational for several years and includes specialized industrial facilities, a solid waste storage facility, and a laboratory accredited by the Gulf Accreditation Center, making it the only one of its kind in the Sultanate of Oman.

Legal Disclaimer:
SaudiGulfProjects
GLOBAL FLOW CONTROL provides the information “as is” without warranty of any kind. We do not accept any responsibility or liability for the accuracy, content, images, videos, licenses, completeness, legality, or reliability of the information contained in this article. If you have any complaints or copyright issues related to this article, kindly contact the provider above. "

Latest News

  • 2 minutes read

    India Speeds Up Hydropower plans on…

    26 Apr. 2025 | Global Flow Control
  • LNG and Industrial Gases
    2 minutes read

    Albania Launches Ambitious Gasification Project in…

    26 Apr. 2025 | Global Flow Control
  • Renewables
    2 minutes read

    GoVerde Energia to Invest R$9 Billion…

    26 Apr. 2025 | Global Flow Control
  • Oil and Gas
    1 minute read

    Gandhar Oil Refinery to participate in…

    26 Apr. 2025 | Global Flow Control